This is an automatic production project for chassis parts and iron stamping.
The principles of project automation system design must be: Individualization. The key point of the project is to meet the needs of automatic production and to solve the problem of assembly precision. The key point of this project is the high labor intensity and low efficiency of the staff.
By changing the traditional production mode of the current punch operator intensive, the robot is used to replace the artificial feed and down material to realize large volume automation production, reduce the cost of manpower and material resources, reduce the risk, improve the economic benefit and profit level of the enterprise, and improve the energy of participating in the international competition.
1. Eight robots are equipped with seven punching machines and one feeding machine, one cutting machines. Each robot can communicate with each other and operate independently.
2. the multi-functional type can handle the paws of various sizes and parts. It has the characteristics of simple replacement, convenient maintenance and low cost.